docs(okf): record CI/CD, AI review, release and secrets decisions
PR Check / Dockerfile lint (droast) (pull_request) Skipped
PR Check / Security scan (Snyk) (pull_request) Skipped
PR Check / ESLint (pull_request) Successful in 36s
PR Check / Typecheck (pull_request) Successful in 38s
PR Check / Secret scan (gitleaks) (pull_request) Successful in 5s
PR Check / Dependency audit (pull_request) Successful in 9s
PR Check / AI code review (opencode) (pull_request) Failing after 13s
PR Check / Dockerfile lint (droast) (pull_request) Skipped
PR Check / Security scan (Snyk) (pull_request) Skipped
PR Check / ESLint (pull_request) Successful in 36s
PR Check / Typecheck (pull_request) Successful in 38s
PR Check / Secret scan (gitleaks) (pull_request) Successful in 5s
PR Check / Dependency audit (pull_request) Successful in 9s
PR Check / AI code review (opencode) (pull_request) Failing after 13s
Four new decision documents covering the pipeline work: layering, AI review setup (provider prefix, v2 CLI, env-only auth, verdict gate), release engineering (release-please manifest mode), and the Snyk pause with the token scope policy. Index grouped, log extended, open questions updated.
This commit is contained in:
1 parent
c70f5d7963
commit
7bf649cba6
8 files changed
+302
-2
No files matched your search
@@ -4,15 +4,19 @@ title: Open questions
|
||||
description: Decisions still to make for the Nuxt site, with what needs each answer.
|
||||
tags: [decision, open]
|
||||
status: draft
|
||||
generated: { by: opencode/deepseek-v4.1-flash, at: 2026-10-18T12:41:52Z }
|
||||
generated: { by: opencode-go/glm-5.3-flash, at: 2026-10-18T12:41:52Z }
|
||||
---
|
||||
|
||||
| Question | Needed by | Default if nobody decides |
|
||||
|---|---|---|
|
||||
| Shape of the production image: a runnable Node server, or static `.output/public/` files for the gateway to embed | the next Dockerfile step | None. The empty `Dockerfile` stays empty. |
|
||||
| Shape of the production image: a runnable Node server, or static `.output/public/` files for the gateway to embed | the next Dockerfile step | None. The empty `Dockerfile` stays empty — and until it holds real instructions, the droast job will fail on it. |
|
||||
| How the compose service mounts the source: the whole repository plus a volume for `node_modules`, or only the directories that get edited | finishing `Local_Development/docker-compose.yml` | None. The compose file is not yet valid. |
|
||||
| Which pnpm version the production image pins | writing the production image | The same as dev, 11.26.0. |
|
||||
| Whether these decisions stay in this bundle or fold into the sibling `OKF_CV_Website` bundle, which already describes the frontend at design level | after the production image exists | None. |
|
||||
| When and how often Snyk runs once re-enabled: weekly schedule, ready-for-review gate, or per-push | re-enabling the snyk job | Stay disabled. |
|
||||
| Whether the AI review job should gate merges (required status check on the verdict) or stay advisory | branch protection setup | Advisory. The review comment is information; blocking merges on an AI verdict is a policy choice, not a technical one. |
|
||||
| How the opencode CLI version in CI gets upgraded: manually bump the pinned 2.0.32, or automate when a new major appears | first review failure after an opencode release | Manual bump. Pinning exists so upgrades are decisions. |
|
||||
| Whether the Go plan's per-model usage windows ($3 per 5 hours for DeepSeek V4 Pro) survive real review frequency, or the review model must move to `deepseek-v4.1-flash` ($80 window) | first quota-limited review | Switch to flash. |
|
||||
|
||||
# The mount trade-off, in detail
|
||||
|
||||
|
||||
Reference in new issue
Block a user