Commit Graph
2 Commits
Author SHA1 Message Date
Noel Sabia f32ad07648 fix: unblock the release PR - real production image, reviewed audit ignores
PR Check / Security scan (Snyk) (pull_request) Skipped
PR Check / ESLint (pull_request) Canceled after 28s
PR Check / Typecheck (pull_request) Canceled after 0s
PR Check / Secret scan (gitleaks) (pull_request) Canceled after 0s
PR Check / Dependency audit (pull_request) Canceled after 0s
PR Check / Dockerfile lint (droast) (pull_request) Canceled after 0s
PR Check / AI code review (opencode) (pull_request) Canceled after 0s
The release PR (chore: release main) failed two checks, both verified
locally before pushing:

- droast: the empty production Dockerfile failed DF071 (no
  instructions). The new Dockerfile is a runnable Node server (SSR):
  multi-stage, manifests-first layers, digest-pinned node:26-slim (same
  digest as the dev container), non-root uid 1000, node-fetch
  HEALTHCHECK. Measured: docker build succeeds in-image, container
  serves HTTP 200 and reports healthy; droast reports 0 errors.
- audit: two high advisories with NO patched release anywhere
  (node-forge <=1.4.0 and braces <=3.0.3 are the newest npm versions;
  both build-time-only paths under nitropack). Recorded as
  auditConfig.ignoreGhsas in pnpm-workspace.yaml with the reason and
  removal condition - the audit output still names what it skipped.
  pnpm 11 ignores the pnpm field in package.json (caught locally via
  the WARN before pushing); settings live in pnpm-workspace.yaml.

OKF_Nuxt: recorded the production-image and audit-policy decisions,
updated log, indexes and open questions.
2026-10-18 21:14:12 +02:00
Noel Sabia 1a78935c23 feat: added dockerignore, a development docker image and a qa/prod docker image 2026-10-18 14:38:14 +02:00