feat(okf): run on full Kubernetes with FreeLens for admin

k3s is out. The cluster is upstream Kubernetes installed with kubeadm:
containerd, single control-plane etcd, Calico for NetworkPolicy.

- add the cluster decision and the FreeLens decision
- move Terraform from the k3s service to kubeadm, Calico, metrics-server
  and the local-path provisioner
- budget ~900 MB for the control plane and plan a bigger machine before 0.3.0
- note kubelet failSwapOn and containerd hosts.toml
- rename 0.3.0 and commit the 0.2.0 done-when to the new stack
- update the German learning plan
This commit is contained in:
Noel Sabia committed 2026-10-24 19:02:17 +02:00
1 parent 6ab76c2a36
commit e022c30527
17 files changed
+214 -64

No files matched your search

+7
View File
@@ -1,5 +1,12 @@
# Update Log
## 2026-10-24
* **Direction change**: k3s is out. Upstream Kubernetes via **kubeadm** (containerd, etcd, Calico) replaces it. See [decision](/decisions/full-kubernetes.md). The control plane costs about twice the memory, so server0 is upgraded to 8 GB or replaced before 0.3.0 — tracked in [open questions](/decisions/open-questions.md).
* **Decision**: [FreeLens](/decisions/freelens-admin-ui.md) is Noel's admin UI, connected to `127.0.0.1:6443` through an SSH tunnel. The rule becomes "no visitor gets API access" instead of "nobody".
* **Update**: [Server budget](/architecture/server-budget.md), [Terraform](/architecture/terraform.md), [system](/architecture/system.md) and [delivery](/architecture/delivery.md) now describe kubeadm, Calico, metrics-server, the local-path provisioner, kubelet `failSwapOn` and containerd `hosts.toml` instead of k3s.
* **Update**: [Roadmap](/roadmap.md) renames 0.3.0 to "Chapters on Kubernetes" and folds the control plane, addons and FreeLens into the 0.2.0 done-when.
* **Update**: Der [Lernplan](/lern-und-entwicklungsplan.md) nennt Kubernetes statt k3s und FreeLens als Beobachtungswerkzeug.
## 2026-10-15
* **Creation**: Added the [Lern- und Entwicklungsplan](/lern-und-entwicklungsplan.md) (German, for the boss at PreZero) and the [Modul-Zusammenfassung template](/modul-zusammenfassung.md) — one German one-pager per finished module.
* **Decision**: Recorded the [learning contract](/decisions/learning-contract.md): 2 h company time per week plus evenings, 6-month learning phase, one-pager per module, Gitea repo goes public.