This commit is contained in:
1 parent
6b1facc552
commit
1dc33853fb
9 files changed
+246
No files matched your search
@@ -20,6 +20,11 @@ Six partner organizations brought one challenge each to the Future City Hackatho
|
||||
* [Preselection / pre-pitch](events/preselection-prepitch.md) - Sunday schedule and selection criteria: pitch, demonstrate, submit the final presentation and code by 13:00, then preselection for the final jury pitch.
|
||||
* [Final pitches](events/final-pitch.md) - Sunday, 15 November at 14:00: 8-minute pitch, 8 minutes of questions, scored on idea and implementation (50%), pitch and storytelling (30%), and vision (20%).
|
||||
|
||||
# Product strategy
|
||||
|
||||
* [PulseCast as a foundation](product/foundation-pitch.md) - Build the data-analysis and ML foundation, then plug it into existing systems; includes the pre-jury feedback and integration-first candidates for retail media, waste routing, city operations, workforce and more.
|
||||
* [Frontend brand](product/frontend-brand.md) - Strict frontend palette `#081723`, `#00C3CD`, `#FFFFFF` and Google font Barlow; overrides Onyx teal, Source Sans 3 and all earlier Stitch palettes.
|
||||
|
||||
# Datasets
|
||||
|
||||
* [HNVG LoRaWAN reception data](data/hnvg-lorawan-reception.md) - Real uplink receptions from roughly 600 water meters and 8 gateways, plus transmitter, gateway, address, and candidate-site tables.
|
||||
|
||||
Reference in new issue
Block a user