Plan — Saturday 07:00 to Sunday 13:00
The real clock
| Time |
What |
Hard? |
| Fri 13 Nov, evening |
SKE access, data, repo skeleton, decisions |
Yes — do this today |
| Sat 14 Nov, 07:00 |
Build starts |
— |
| Sat 10:00 |
Gate 1: public HTTPS hello-world on SKE |
Yes |
| Sat 13:00 |
Gate 2: data pipeline + API contract + app shell |
Soft |
| Sat 18:00 |
Gate 3: end-to-end core on SKE, 3 phones |
Yes |
| Sat 23:00 |
Feature freeze |
Yes |
| Sun 15 Nov, 06:00 |
Deploy freeze |
Yes |
| Sun 07:00–09:00 |
Rehearse, record fallback, pack |
Yes |
| Sun 10:00 |
Preselection demo |
Yes |
| Sun 13:00 |
Submit presentation + code |
Yes |
| Sun 14:00 |
Final pitch (if selected) |
Stretch |
You said "24 hours from 07:00." The actual submission deadline is 30 hours later, but only ~24 of those are usable build time. Use the extra 6 hours for rehearsal and submission, not features.
Friday evening (today) — 2–3 hours, not 6
Saturday
| Time |
Human |
Data/ML agent |
Go agent |
Nuxt agent |
Infra/QA agent |
| 07:00–08:00 |
Stand-up, confirm namespace, assign |
Verify CSV, write parser |
API skeleton, health |
Nuxt SSR shell |
Namespace smoke test, Gitea pull |
| 08:00–10:00 |
Unblock, deploy hello-world |
Hourly aggregation, features |
Contract endpoints |
Layout, mock data |
Cloudflare Tunnel, Gate 1 |
| 10:00–13:00 |
Integrate, review |
Baseline model, FastAPI skeleton |
Sensors/series/forecast |
Map + time series |
Build/push all three images |
| 13:00–16:00 |
Gate 2, integrate |
Weather join, scenario grid |
Staffing endpoint, SSE, cache |
Staffing view, scenario controls |
Deploy web/api/ml, smoke test |
| 16:00–19:00 |
Test on phones, cut |
FastAPI fallback test, model card |
Load test 120 SSE |
Mobile polish, live view |
SSE through Tunnel, Gate 3 |
| 19:00–22:00 |
Demo rehearsal #1 |
Fix data/API edge cases |
Fix API/SSE bugs |
Fix UI bugs, empty states |
Load test, rollback drill |
| 22:00–23:00 |
Freeze, tag, deploy |
Freeze model/JSON |
Freeze binary |
Freeze build |
Freeze manifests |
| 23:00–23:30 |
Feature freeze. Write down what is cut. |
— |
— |
— |
— |
| 23:30–04:30 |
Sleep (yes, really) |
— |
— |
— |
— |
If Gate 1 slips past 10:00, stop feature work and fix deployment. If it slips past 12:00, escalate to the mentors and switch to the fallback. Do not build a beautiful app that is not on SKE.
Sunday
| Time |
What |
| 04:30–06:00 |
Final verification. Fix only a demo blocker; re-deploy the frozen image; verify health. |
| 06:00–07:00 |
Deploy freeze. No cluster changes. |
| 07:00–08:30 |
Rehearse the 5-minute preselection demo and the 8-minute final; record a backup video. |
| 08:30–09:00 |
Pack: laptop, charger, 3 phones, hotspot, QR slide, backup video, USB stick. |
| 10:00 |
Preselection. Demo. Explain. Do not debug on stage. |
| 13:00 |
Submit presentation + code. |
| 14:00 |
Final pitch if selected. |
Workstreams and agent contracts
The human owns decisions, integration, deployment, and the demo. Agents own code in isolated folders. Do not let agents deploy to SKE without review.
1. Human — architect / integrator / presenter
- Owns
mission/, deploy/, the final demo, and every merge.
- Writes the API contract before agents start.
- Runs the 10:00 / 13:00 / 18:00 / 23:00 checkpoints.
- Cuts scope without debate when a gate slips.
- Does not write frontend CSS at 02:00.
2. Data/ML agent — ml/
- Owns
ml/, data/ (git-ignored raw), generated JSON, the FastAPI service.
- Delivers: batch pipeline (
make data), sensors.json, series.json, forecasts.json, metrics.json, context.json (Open-Meteo weather + BW holidays), model_card.md, FastAPI /predict and /simulate with /healthz and /readyz.
- Must not touch
web/ or api/ code.
- Definition of done: reproducible batch run; time-based validation; baseline comparison; no leakage; FastAPI starts with the baked model; JSON schema matches the contract; Go cache fallback tested.
- Prompt: "Read mission/README.md, mission/data.md and mission/architecture.md. Build the batch pipeline and FastAPI service. Do not tune for more than 2 hours. Report MAE/WAPE vs seasonal naive and the exact JSON/API schema."
3. Go agent — api/
- Owns
api/.
- Delivers: health/ready, sensors, series, forecast, staffing, scenario POST, SSE stream, FastAPI client, cached fallback, tests for the SSE hub and handlers.
- Must not touch
web/ or ml/.
- Definition of done:
go test ./...; runs with the generated JSON; works when FastAPI is down; 120 concurrent SSE clients; graceful shutdown.
- Prompt: "Read mission/architecture.md. Implement the API contract exactly. Use the JSON fixtures in
api/testdata/. Cache FastAPI responses and fall back to baked JSON. Do not add a database, a framework, or auth beyond the control token."
4. Nuxt agent — web/
- Owns
web/.
- Delivers: app shell, pulse map, time-series chart, forecast + staffing view, weather card, holiday badges, scenario controls,
/live mobile view, /stage big-screen view, /control token page, empty/error states.
- Must not touch
api/ or ml/.
- Definition of done: builds with
nuxt build (SSR); works with mock JSON before the API exists; responsive at 390 px and 1440 px; no console errors; browser-only map/chart wrappers; Onyx components where sensible.
- Prompt: "Read mission/README.md and mission/architecture.md. Build the screens against the mock data in
web/mock/. Use @sit-onyx/nuxt with SSR. Wrap MapLibre and SSE in client-only components. Keep the map dependency replaceable with a static image."
5. Infra/QA agent — deploy/
- Owns
deploy/, Dockerfiles, Makefile, smoke tests, load test.
- Delivers: multi-stage Dockerfiles for web/api/ml, namespace-only k8s manifests, Cloudflare Tunnel Deployment, imagePullSecret, PSA-compliant securityContext,
make deploy, make smoke, make load.
- Must not change app logic or install cluster-scoped resources.
- Definition of done: a fresh namespace deploys all three images plus
cloudflared; HTTPS works; /api/healthz and FastAPI /healthz pass; 120 SSE clients for 5 minutes; rollback documented.
- Prompt: "Read mission/architecture.md and mission/friday-blockers.md. Produce namespace-only manifests, a Cloudflare Tunnel Deployment, and a smoke test. Do not install cert-manager, external-dns, an ingress controller, Jobs/CronJobs or any CRD. Use the Gitea registry."
Integration cadence
Every checkpoint: build, deploy, open on a phone, update the README, write down what broke.
| Checkpoint |
Demoable outcome |
If missing |
| Sat 10:00 |
Public HTTPS hello-world |
Stop features; fix deployment. |
| Sat 13:00 |
Real data in API; app shell on SKE |
Cut map polish; keep data + shell. |
| Sat 18:00 |
Forecast + staffing + scenario on 3 phones |
Cut audience view and poll. |
| Sat 23:00 |
Frozen demo, 5-minute run-through |
Cut to 3 screens: map, forecast, staffing. |
Effort budget
| Area |
Share |
Why |
| Frontend + SSR integration |
35% |
The long pole. Map, charts, responsive, scenario UI, hydration, empty states. |
| Data/ML + FastAPI |
20% |
Batch baseline is proven; FastAPI, caching and fallback add work. |
| Go API + SSE |
15% |
Straightforward, but cache fallback and 120-client load testing take time. |
| Infra + deployment |
20% |
Namespace-only, Gitea registry, Cloudflare Tunnel, three services, smoke tests. |
| Demo + docs |
10% |
High leverage for judging; do not leave it to the last hour. |
If you are solo, cut the audience view, the poll, the custom domain, and the battery panel. Keep the map, forecast, staffing, scenario, SSE, and SKE deployment.
Risks
| Risk |
Likelihood |
Impact |
Mitigation |
| SKE access late |
Medium |
Blocks the requirement |
Access requested, expected today; namespace smoke test; escalate Saturday 09:00; manifests ready. |
| Namespace quota too small |
Medium |
Three pods do not fit |
Check quota first; degradation ladder: 2 pods or 1 pod. |
| Gitea pull fails |
Medium |
No images |
Test hello-world pull; check gitea-regcred, DNS, NetworkPolicy; public registry fallback. |
| Cloudflare Tunnel unavailable |
Medium |
No public HTTPS |
Check outbound 443; use a temporary local tunnel; escalate. |
| Frontend scope explodes |
High |
Misses freeze |
Three screens only; mock data first; cut P1 at 18:00. |
| Over-engineering |
High |
Wastes the day |
Three services maximum; no DB, no extra platform, no CI beyond build/push. |
| FastAPI is a single point of failure |
Medium |
Blank demo |
Go caches forecasts; FastAPI optional at runtime; test the fallback. |
| Venue network fails |
Medium |
Demo dies |
Mobile data; local build; recorded video. |
| Onyx/Nuxt SSR integration |
Low |
UI delay |
SSR tested; wrap browser-only components; fall back to SPA. |
| Model/data leakage |
Medium |
Credibility |
Time-based split; no future features; show baseline. |
| Single API pod restarts |
Low |
Brief outage |
Probes, small image, Recreate, local fallback. |
| Agent integration conflicts |
Medium |
Merge pain |
Four worktrees, folder ownership, API contract, human review. |
| No sleep |
Medium |
Bad pitch |
Sleep 4–5 h; storytelling is 30% of the final score. |
Friday-night checklist
Sunday-morning checklist