--- version: 1 slug: "plan" primary_target: "plan" related_targets: ["/", "/live", "/stage"] --- # Surface brief — decision, stage, phone ## Scope Primary: `/plan` (Operate). Related: `/` (Persuade), `/live` and `/stage` (Experience), with supporting `/forecast`, `/simulate`, `/about`, `/control` to follow in the finish pass. ## Audience and job A Heilbronn duty manager needs the coming week's staffing decision: who works, when, what it costs, and what the trade-off is. A hackathon audience needs the same decision at ten metres on a projector, then in their hand on a phone. The presenter needs to change one scenario and have every surface follow honestly. ## Success - `/plan` answers what to do above the fold: peak shift, staff count, staff-hours, cost vs flat, coverage. - `/live` answers on a 390×844 phone above the fold: shift, staff count, one-line reason, freshness. - `/stage` is readable at 10 m without app chrome. - `/` sets up the story in one screen with the live plan as proof. - Measured, modelled and assumed stay visibly distinct; the real 14–20 Nov window is labelled. ## Constraints Live API data only; no fabricated numbers. Preserve routes, API contracts, Onyx components, SSR, accessibility, reduced motion and the existing build/tests. The paper brief's 210 h / €3,360 is stale; the demo baseline is the live sunny-saturday-market plan (5 peak, 172 staff-hours, €2,752 vs €5,600 flat, 100% coverage). ## Direction contract THESIS: A shift board, not a dashboard. The week's footfall becomes a physical timetable with an orange peak block; the category's metric-card hero and admin shell are refused. OWN-WORLD: Cool paper `#F4EFE6`, ink `#16130F`, signal orange `#E84100` for the peak (text `#B63A00` on paper), board green `#2E6B4F` for coverage. Archivo variable: condensed 78% display, tabular numerals, heavy rules, zero radius, no shadows. `/stage` and `/live` invert to ink `#0E100E` with paper type and bright orange. STORY: The manager reads "Five on Saturday, 10:00–14:00", sees the week board, and understands 172 staff-hours cost €2,752 against €5,600 flat with 100% coverage. They approve or export. The judge sees the same plan on stage and phone; a scenario change redraws the pulse and the blocks. FIRST VIEWPORT: `/plan` — h1 "Five on Saturday." with shift time and a receipt of staff-hours/cost/coverage on the left, a full-width seven-day shift board with the orange peak on the right/below, and Approve/Export actions. `/` — headline "Saturday needs five." beside the live board. `/live` — giant 5, Saturday 14 Nov, 10:00–14:00, one-line peak-forecast reason, freshness. `/stage` — full-bleed dark board: 5 staff, day/time, week board, cost line, QR. FORM: Shift board / timetable. The user pinned the world and its first-surface experience; no roll was needed. `seed: none (pinned)` — "A — Shift board. Full replacement. Paper/ink ground, signal orange for the peak, heavy timetable rules, tabular numerals, physical time blocks. /stage inverts to a dark board." FINISH: unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance.