Files
web-nuxt/.impeccable/surfaces/plan.md
T
Noel Sabia 33063afbdf
ci / check (push) Successful in 50s
design: give PulseCast a shift-board identity
- replace default Onyx surfaces with paper/ink, signal orange and Archivo
- make /plan answer peak, staff-hours, cost vs flat and coverage above the fold
- add the weekly shift board, shared plan helpers and a pulse line
- rebuild /live as a phone-first dark board and /stage as a full-bleed projector
- label the real 14-20 Nov window; remove 'next week' claims
- keep Onyx components, SSR, live scenario updates and accessible states
2026-11-14 11:03:18 +01:00

3.2 KiB
Raw Blame History

version, slug, primary_target, related_targets
version slug primary_target related_targets
1 plan plan
/
/live
/stage

Surface brief — decision, stage, phone

Scope

Primary: /plan (Operate). Related: / (Persuade), /live and /stage (Experience), with supporting /forecast, /simulate, /about, /control to follow in the finish pass.

Audience and job

A Heilbronn duty manager needs the coming week's staffing decision: who works, when, what it costs, and what the trade-off is. A hackathon audience needs the same decision at ten metres on a projector, then in their hand on a phone. The presenter needs to change one scenario and have every surface follow honestly.

Success

  • /plan answers what to do above the fold: peak shift, staff count, staff-hours, cost vs flat, coverage.
  • /live answers on a 390×844 phone above the fold: shift, staff count, one-line reason, freshness.
  • /stage is readable at 10 m without app chrome.
  • / sets up the story in one screen with the live plan as proof.
  • Measured, modelled and assumed stay visibly distinct; the real 14–20 Nov window is labelled.

Constraints

Live API data only; no fabricated numbers. Preserve routes, API contracts, Onyx components, SSR, accessibility, reduced motion and the existing build/tests. The paper brief's 210 h / €3,360 is stale; the demo baseline is the live sunny-saturday-market plan (5 peak, 172 staff-hours, €2,752 vs €5,600 flat, 100% coverage).

Direction contract

THESIS: A shift board, not a dashboard. The week's footfall becomes a physical timetable with an orange peak block; the category's metric-card hero and admin shell are refused.

OWN-WORLD: Cool paper #F4EFE6, ink #16130F, signal orange #E84100 for the peak (text #B63A00 on paper), board green #2E6B4F for coverage. Archivo variable: condensed 78% display, tabular numerals, heavy rules, zero radius, no shadows. /stage and /live invert to ink #0E100E with paper type and bright orange.

STORY: The manager reads "Five on Saturday, 10:00–14:00", sees the week board, and understands 172 staff-hours cost €2,752 against €5,600 flat with 100% coverage. They approve or export. The judge sees the same plan on stage and phone; a scenario change redraws the pulse and the blocks.

FIRST VIEWPORT: /plan — h1 "Five on Saturday." with shift time and a receipt of staff-hours/cost/coverage on the left, a full-width seven-day shift board with the orange peak on the right/below, and Approve/Export actions. / — headline "Saturday needs five." beside the live board. /live — giant 5, Saturday 14 Nov, 10:00–14:00, one-line peak-forecast reason, freshness. /stage — full-bleed dark board: 5 staff, day/time, week board, cost line, QR.

FORM: Shift board / timetable. The user pinned the world and its first-surface experience; no roll was needed. seed: none (pinned) — "A — Shift board. Full replacement. Paper/ink ground, signal orange for the peak, heavy timetable rules, tabular numerals, physical time blocks. /stage inverts to a dark board."

FINISH: unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance.